Projects

Installation & Commissioning Works

  • Clients

    Siemens Transmission & Distribution
  • Locations

    Drakelow & Ratcliffe-on-Soar/Willington 400kV Substation
  • End User

    National Grid

Services Provided

  • Installation

    Yes
  • Site Management

    Yes
  • Commissioning

    Yes
  • Design

    No
  • Health & Safety

    Yes

Project Description

The aim of the National Integrated Control and Protection Project (NICAP) is to continue the replacement of ageing light current equipment. At Drakelow 400kV substation this consists of the replacement of the existing feeder protection on the Cellarhead, Ratcliffe-on-Soar, Rugeley and Willington East circuits.

Project Highlights

The Drakelow to Ratcliffe & Willington Circuts where completed during 2008, both circuits where sucessfully returned to service on time and within budget.

Client Feedback

"The NICAP panels were fitted to an excellent standard and are a quality product"

Andy Marratt, National Grid

"The project generally went very well, the client has thanked the team for their efforts. we would have no hesitation in recommending this team, and look forward to working with them on future projects"

Peter Reed, Siemens