Oldbury 275/132kV Substation

Project Gallery

Project Information

AIS

  • 3-off 275kV Cable Sealing Ends.
  • 3-off 275kV Surge Arrestors.
  • 3-off 275kV CVT’s.
  • 1-off 275kV Disconnector with 2 integral Motorised Earth switches (3 phase).
  • 3-off 275kV Current Transformers.
  • 1-off 275kV Live Tank Circuit Breakers.
  • 3-off 132kV Surge Arrestors.
  • 13-off 132kV Post Insulator Assembly.
  • 3-off 132kV Underslung Post Insulators.
  • 1-off 132kV Free Standing Earth Switch.
  • 3-off 132kV High Accuracy Metering.
  • 1-off 132kV CVT (Yellow Phase).
  • 1-off 132kV Dead Tank Circuit Breaker (3 phase). 
  • 2-off 132kV Disconnector with 1 integral Motorised Earth switches (3 phase).
  • Associated busbars, conductors, and clamps.
  • 1-off Marshalling Kiosk.
  • 3-off VT Boxes.

Protection / Control

  • New protection and control panels at Oldbury 
  • Modifications to existing protection at Kitwell and Ockerhill to upgrade to 3 ended protection.
  • New multicore cabling and associated wiring modifications.

SES carried out the successful installation and commissioning of all the above equipment at Oldbury substation. SES received outstanding feedback from our client Burns and McDonnell on this 8-stage project spanning 13 months.

Contact Us

Visit us at:

Substation Engineering Services Limited,
6 Parker Court,
Dyson Way,
Staffordshire Technology Park,
Beaconside,
Stafford,
ST18 0WP

LinkedIn
Contact Us
First
Last